Posts Tagged ‘jobs’

An Enterpise Dinghy in the Workshop for some TLC

March 5, 2017

An Enterprise in need of a good bit of restoration and a good drying out before it can get re-varnishing on the decks and inside before it can get refitted

The decks need a good rubbing down and re-varnishing

The port front spray rail needs to befitted and the deck fittings will be complete

Now that it is in the workshop and out of the weather then work can re-start on the Enterprise

Advertisements

Refitting a rudder fitting using a traditional method of fixing the fitting to the rudder blade

February 26, 2017

Making traditional copper fixings to fit rudder fitting to rudder.

Fitting the first of copper fixings

Half of the fixing made and ready to fix to the rudder fitting

All of the fixing cliched up and rudder fitting fixed in position and now getting a coat of underwater primer before fixing the rudder back on the yacht

Glassing in the keel backing pads

December 16, 2016

Starting to glass in the backing pads

The whole of the backing pads glass over with two layers of 2 oz CSM

looking forward to the bow seat / buoyancy tank all we have do now is glass in the stern seat / buoyancy tank. Then fit the centre seat blocks and then lift it out of the mould to fit the inwales and gunwales.

Making and shaping the outboard pad and reinforcement battens and centre keel reinforcement batten.

November 29, 2016

Making and shaping the internal after of the outboard pad

Making and shaping the bilge keel reinforcement wooden battens

Making and shaping the centre keel reinforcement and then holding them down into position