Archive for the ‘New Builds’ Category

A busy day in the workshop with boat movements and new projects underway

April 29, 2017

All change in the workshop, out with the Enterprise

in with a couple of small dinghies for work, one for repairs and the other dinghy to be fitted out

The outboard as been serviced and just need a new fuel line and the returned to its owner for him to use it for trawling along at slow speed

The Hardy Navigator table and cabin doors and hatch getting their final coats of varnish

The 8ft dinghy in its mould ready to be removed and fitted out

Another 8ft dinghy in for repairs to its transom where the wooden trim which as come off when it was last out sailing

The Enterprise is out in the yard while the small dinghies are being worked on before coming back in to be finished off

Another 8ft dinghy which as been brought in for a restoration by the company’s second apprentice under the watchful eye of the boss

Advertisements

More work done the Little Mai dinghy over the Christmas break

December 31, 2016

All the glassing done inside the dinghy apart from the centre thwart seat blooks

   

Now ready to be flow coated

Flow coated and the stern seat in position ready to glass in position

The bow seat glass work now flow coated and ready for the inspection hatch to be fitted and the hardwood strips to be fitted on the top

Glassing in the keel backing pads

December 16, 2016

Starting to glass in the backing pads

The whole of the backing pads glass over with two layers of 2 oz CSM

looking forward to the bow seat / buoyancy tank all we have do now is glass in the stern seat / buoyancy tank. Then fit the centre seat blocks and then lift it out of the mould to fit the inwales and gunwales.