Bow planks and other work

Cutting the scraph joint on the trailing edge of the plank

20150303_095545

All glued and screwed in place ready to be caulked up with caulking cotton

20150303_120555

Re-fixing port side bow planks so that is the bow plank repairs finished apart from the caulking and filling the seams with putty

20150303_121621

The aft planks finished off apart from fitting a couple of ribs in and caulking the seams

20150303_162152

The cabin sides fitted with their backrests

20150304_113913

Just need to fit the end blocks to secure the ends from moving

20150304_113924

The same at the other end as well

20150304_113928

Advertisements

Tags: , , ,

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: