Busy day on Mai-Star II

A large gap between the stern post and the inner knee, most of this will go when the boat is back in the water and a couple of through bolts are put in the stern post and the two are bolted together.

The new two bilge pump outlets dry fitted.
The two outlets from the outside
 The port side all back to bare wood and the started to be sanded down ready to have work done on the hull.
 A head on photo before and after and showing the waterline being change as the weight in the boat is now changed.
 The hull now started to be sanded back ready to have the work done on the hull.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: